Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hueman domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wwwrazum/public_html/wp-includes/functions.php on line 6260

Notice: Only variables should be passed by reference in /home/wwwrazum/public_html/wp-content/themes/hueman/option-tree/ot-loader.php on line 98

Deprecated: Optional parameter $_eligible_zones declared before required parameter $location is implicitly treated as a required parameter in /home/wwwrazum/public_html/wp-content/themes/hueman/functions/init-front.php on line 749

Deprecated: Optional parameter $_eligible_zones declared before required parameter $location is implicitly treated as a required parameter in /home/wwwrazum/public_html/wp-content/themes/hueman/functions/init-front.php on line 779

Notice: Only variables should be passed by reference in /home/wwwrazum/public_html/wp-content/themes/hueman/option-tree/ot-loader.php on line 326
The Control Joint Problem – Roadware Incorporated

The Control Joint Problem

There is a big problem with control joints or contraction joints. They are the saw cut joints we cut into concrete slabs to control cracking as the concrete cures. The problem is the floor owner typically wants the floor poured, joints cut, joints filled, and building occupied in 60 days or less. Concrete cures hard in typically 28 days, but it continues to shrink and crack for a about a year.  The contraction joint that was 1/4″ when it was cut, can almost double in width in that first year leaving the 1/4″ of joint filler a bit short, cracked and generally a mess. The sidewalls of the joint are left unprotected and the joint spalling begins. You can replace all that gummy polyurea or brittle epoxy with Roadware 10 Minute Concrete Mender™ and leave your control joint problem behind.

[embedyt] http://www.youtube.com/watch?v=cms9WkOrIUU&width=474&height=296[/embedyt]

 


contraction-joint-slab-dynamic-load

 

See more about Control Joints here:

You may also like...

5 Responses

  1. Dave Wilson says:

    Great education and so true. Roadware concrete products are the best at solving these control joint issues!

  2. Luke Yancey says:

    Thank you for uploading the video along with your advice. Critical joints are the worst. If you use roadware products like Dave mentioned, you can go a long way in fixing the issue, though.

  3. zen marcle says:

    Roadware concrete products are the best at solving these control joint issues! and thanks for uploading video

  4. Jade Brunet says:

    I appreciate this information about concrete. It is interesting to learn about the control and contraction joint problems. I did not know that concrete cures hard in 28 days but continues to shrink and crack for about a year. Something to continue would be to settle the ground beneath the concrete to try to avoid this cracking.

  5. Hi Kelton,
    Really Roadware products are more useful for repairing any concrete work. I like these products. It is more effective for any kind of concrete repair work. Thanks for your wonderful blog.

Leave a Reply

Your email address will not be published. Required fields are marked *