Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hueman domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wwwrazum/public_html/wp-includes/functions.php on line 6260

Notice: Only variables should be passed by reference in /home/wwwrazum/public_html/wp-content/themes/hueman/option-tree/ot-loader.php on line 98

Notice: Only variables should be passed by reference in /home/wwwrazum/public_html/wp-content/themes/hueman/option-tree/ot-loader.php on line 326
Floor repair stands up to forklift damage. – Roadware Incorporated

Floor repair stands up to forklift damage.

 

The Microdoweling™ action of Roadware 10 Minute Concrete Mender™ can structurally, “glue” concrete back together. Pictured here is a concrete break-out caused by a forklift hitting an anchored steel bollard.

Anchored post hit with forklift causing damage to floor.

 

Concrete Mender™ was used to re-attach the broken concrete piece and repair the crack.

Damaged floor anchoring steel post is repaired and loose concrete piece re-attached with Concrete Mender™.

 

After about 10 minutes, the repair was buffed smooth and open for traffic.

Concrete Mender™ repair is buffed smooth and ready for service.

 

About a week later, the bollard was again hit with a forklift and at the same angle. The repaired concrete held in place. The concrete broke on the other side of the bollard this time. Concrete Mender can’t stop forklifts from hitting bollards. It can help minimize the damage and make lasting repairs.

Concrete Mender floor repair one week after installation. The steel post was hit again with a forklift and is still holding in place.

You may also like...

Leave a Reply

Your email address will not be published. Required fields are marked *