Floor repair stands up to forklift damage.
The Microdoweling™ action of Roadware 10 Minute Concrete Mender™ can structurally, “glue” concrete back together. Pictured here is a concrete break-out caused by a forklift hitting an anchored steel bollard.
Concrete Mender™ was used to re-attach the broken concrete piece and repair the crack.
After about 10 minutes, the repair was buffed smooth and open for traffic.
About a week later, the bollard was again hit with a forklift and at the same angle. The repaired concrete held in place. The concrete broke on the other side of the bollard this time. Concrete Mender can’t stop forklifts from hitting bollards. It can help minimize the damage and make lasting repairs.