Hoover Dam Demonstration Project Update
Project Update: Almost 7 years after application, this Roadware 10 Minute Concrete Mender™ and MatchCrete™ Clear repair still looks good.
![](http://roadmender.us/wp-content/uploads/2012/02/dam1.jpg)
Roadware Hoover Dam Demonstration Project
Use Roadware 10 Minute Concrete Mender and MatchCrete™ Clear to make decorative and color matching repairs.
![](http://roadmender.us/wp-content/uploads/2012/02/dam2.jpg)
1) Top of dam shows various cracks.
![](http://roadmender.us/wp-content/uploads/2012/02/dam3.jpg)
2) Damage is built up with Roadware 10 Minute Concrete Mender.
![](http://roadmender.us/wp-content/uploads/2012/02/dam4.jpg)
3) A top layer of MatchCrete™ and matching brown silica sand is applied.
![](http://roadmender.us/wp-content/uploads/2012/02/dam5.jpg)
4) Structurally bonded and blended well with surrounding concrete.
Special thanks to Randy Sisson and Minitman Supply Colorado for sending this in.