Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hueman domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wwwrazum/public_html/wp-includes/functions.php on line 6260

Notice: Only variables should be passed by reference in /home/wwwrazum/public_html/wp-content/themes/hueman/option-tree/ot-loader.php on line 98

Deprecated: Optional parameter $_eligible_zones declared before required parameter $location is implicitly treated as a required parameter in /home/wwwrazum/public_html/wp-content/themes/hueman/functions/init-front.php on line 749

Deprecated: Optional parameter $_eligible_zones declared before required parameter $location is implicitly treated as a required parameter in /home/wwwrazum/public_html/wp-content/themes/hueman/functions/init-front.php on line 779

Notice: Only variables should be passed by reference in /home/wwwrazum/public_html/wp-content/themes/hueman/option-tree/ot-loader.php on line 326
Flexible Cement II – Tricks of the Trade – Roadware Incorporated

Flexible Cement II – Tricks of the Trade

From the Roadware Crackrepair Fax Newsletter August 17, 2004

Tricks of the Trade

Hereʼs one you can warm up to. While installing 14 cases of Roadware Flexible Cement II (thatʼs 168 tubes), Roadware contractor Dave Wilson got tired of shaking and turning tubes, waiting for the ball bearings to start clicking. Dave headed over to a Super Wal-Mart looking for an electric blanket. It was the wrong time of the year, but they did have heating pads.

Dave had this crazy idea if they warmed up the cartridges, the material would mix immediately, speeding up the installation and keeping the installation virtually striation clear. To make a long story short, he got that and a whole lot more.

 

  • The heating pads exactly fit the boxes of Flexible Cement II™..
  • Open the bottom of the box, remove the bubble packing and insert a heating pad.
  • Open the top and place an additional heating pad on top of the cartridges.
  • Turn the pads on to medium/medium high.
  • Wait 15 minutes.
  • Take out a layer of cartridges (3) and place the pad on the next layer.
  • Shake the three cartridges until the white side has a consistent color. You will hear the steel ball rattle inside. Set up the three cartridges and run out 10-15 feet of expansion joint or construction joint with FLEX II.
  • Have second crew member follow behind with a second application and a third crew member follow with a third application.
  • At the end of the third application leave the nozzle stuck in the joint to dam the warmed FLEX II.
  • Set up three more cartridges and continue the run until complete.
  • The warmed FLEX II will self level, require no additional trowel work and if done carefully, no clean-up needed. Pull the nozzle-dam and replace it with FLEX II as you start the next run. This will eliminate cold joints.
  • When breaking for lunch, reduce pad heat to medium.

Dave’s Comments: “Iʼve never heard the ball bearings rattle before, but I hear them now. This puts cartridge applications on a par with bulk-mixed FLEX II. Itʼs quick, easy and very effective. The material thins to Mender-like viscosity and penetrates joint walls securing the FLEX II and the joint. The pads may be reused, of course, and the set-up cost is minimal.”

“I highly recommend you try it. It sure worked well on this job and we will continue to use a little heat to keep things flowing.”

Roadwareʼs Comments: “Why didnʼt we think of that?”

 

 Electric heating pads are a good way to warm up Flexible Cement II prior to application. Use caution not to “cook” your cartridges for more than 12 hours. Leaking at the seals may be the result.

 

 